Proposed Bond Projects in Redmond School District Schools

If passed, the proposed Redmond School District Bond would fund projects that would:

Address health, safety, and security throughout the district with new fire alarm systems, fire sprinklers, updated playground surfaces, security fencing, and emergency generators. The bond would fund a new, secure front entrance at Ridgeview High School. It would also fund new air conditioning for second floor classrooms at Terrebonne Community School and Sage Elementary to address heat and air quality concerns.

Preserve and maintain schools with repairs to major building systems, parking lots, and walkways as well as make repairs to the 50-year-old HVAC hydronic pipes at Redmond High School. If passed, the proposed measure would fund energy efficiency projects such as updates to HVAC, plumbing, and electrical systems; new windows and LED lighting; and xeriscaping or turf athletic fields at both high schools to reduce water usage.

Expand student opportunities by renovating Career and Technical Education classrooms, theater, art, band, choir, and athletic spaces at Redmond High School. The proposed measure would additionally fund the expansion of Tumalo Community School to reintroduce grades 6-8, returning the school to a K-8 school once again.

Map

Elton Gregory Middle School | Built in 2006

Health, Safety, & Security

  • Updated Security Fencing

Preserve & Maintain Schools

  • New LED Lighting
  • HVAC Upgrades
  • Electrical Upgrades
  • New Gym Sound System
  • New Gym Scoreboard
  • Update Parking Lot & Walkway Surfaces
  • Resurface Track

Hugh Hartman Elementary School | Built in 1995

Health, Safety, & Security

  • New Fire Alarm System

Preserve & Maintain Schools

  • New Windows
  • New LED Lighting
  • Xeriscaping to Reduce Water Usage
  • Update Walkway Surfaces
  • New Roof on Concessions Building

John Tuck Elementary School | Built in 1947

Health, Safety, & Security

  • New Fire Alarm System

Preserve & Maintain Schools

  • New LED Lighting
  • HVAC Upgrades
  • Plumbing Upgrades
  • Electrical Upgrades
  • Window Updates
  • Xeriscaping to Reduce Water Usage
  • Replace Wire Glass Windows
  • New Flooring
  • Remodel ILS Classroom Space
  • Remodel Staff Restroom
  • Update Playground Surfaces

M.A. Lynch Elementary School | Built in 1965

Health, Safety, & Security

  • New Fire Sprinklers

Preserve & Maintain Schools

  • New LED Lighting
  • New Windows
  • Electrical Upgrades
  • Remodel & Update ILS Classrooms
  • Update Parking Lot & Walkway Surfaces
  • New Flooring

Obsidian Middle School | Built in 1980

Preserve & Maintain Schools

  • Xeriscaping to Reduce Water Usage
  • HVAC Upgrades
  • New Ceiling Tiles
  • New Gym Bleachers
  • New Gym Sound System
  • Resurface Track
  • Repair Fencing
  • Remodel Restrooms

Redmond High School | Built in 1970

Health, Safety, & Security

  • Encapsulate/Abate Asbestos
  • New Fire Alarm System
  • New Emergency Generator

Preserve & Maintain Schools

  • Repair Critical Failure in HVAC Hydronic Piping
  • New LED Lighting
  • HVAC Upgrades
  • Electrical Upgrades
  • Resurface Track
  • Xeriscaping and Turf on Athletic Fields to Reduce Water Usage

Expand Student Opportunities

  • Remodel Auditorium & Restrooms, Band & Choir Classrooms, Locker Rooms, Gym, Kitchen, Commons, CTE Spaces, Art Room

Ridgeview High School | Built in 2012

Health, Safety, & Security

  • Remodel Front Entry for Security

Preserve & Maintain Schools

  • Xeriscaping to Reduce Water Usage
  • New Turf on Athletic Fields to Reduce Water Usage
  • New LED Lights
  • HVAC Updates
  • Resurface Tennis Courts
  • Resurface Track

Sage Elementary | Built in 2010

Health, Safety, & Security

  • New Upstairs Air Conditioning for Air Quality & Temperature Control

Preserve & Maintain Schools

  • New LED Lighting
  • Xeriscaping to Reduce Water Usage
  • Updated Playground Fall Protection

StepUP at Edwin Brown | Built in 1950

Health, Safety, & Security

  • New Fire Alarm System & Sprinklers

Preserve & Maintain Schools

  • New LED Lighting
  • HVAC Upgrades
  • Plumbing Upgrades

Terrebonne Community School | Built in 1940

Health, Safety, & Security

  • New Upstairs Air Conditioning for Enhanced Air Quality

Preserve & Maintain Schools

  • New LED Lighting
  • Xeriscaping to Reduce Water Usage
  • HVAC Updates
  • Update East & West Parking Lot Surfaces

Tom McCall Elementary School | Built in 2006

Health, Safety, & Security

  • New Fire Alarm System

Preserve & Maintain Schools

  • Xeriscaping to Reduce Water Usage
  • New LED Lighting
  • HVAC Upgrades
  • Update Walkway Surfaces
  • Resurface Playground

Tumalo Community School | Built in 1920

Health, Safety, & Security

  • Replace Playground Asphalt

Preserve & Maintain Schools

  • New LED Lighting
  • Upgraded Electrical
  • Remodel Kitchen/Cafeteria, Gym, Restrooms, Front Office
  • Updates to Courtyard
  • Parking Lot & Walkway Upgrades

Expand Student Opportunities

  • Building Expansion to Reintroduce Grades 6-8

Vern Patrick Elementary School | Built in 1995

Health, Safety, & Security

  • Replace Playground Asphalt

Preserve & Maintain Schools

  • New LED Lighting
  • Xeriscaping to Reduce Water Usage